Reinforcement of Ukpilla 132/33kV Substation with 1 x 60MVA, 132/33kV Power Transformer at Ukpilla, Edo State

Scope of Work:

  • Erection of 1 nos. 132kV Line Bay (1 no. fully equipped diameter)
  • Complete Installation of 1 x 60MVA, 33/34.5kV Power Transformer plus 1 no. station service transformer
  • Construction of 132kV & 33kV Busbars
  • Installation of Earthing Reactor, 132kV and 33kV Control Panels
  • 132kV and 33kV Instrument Transformers for metering and protection of Installation
  • Installation of Deep Cycle Battery Banks / Charger System
  • Provision & Installation of 50kVA Sound Proof Diesel Generator
  • Construction of Access Roads, Perimeter Fencing, Switchyard gravelling, Lighting and related works
  • Provision of effective Earthing Systems for entire Substation
  • Installation of IEC 61850 compliant communication Protocol
  • Construction of Cable Trench, laying and termination of all Power and Control Cables
  • Testing, Commissioning and maintaining within defect liability period
  • Procurement & Installation of 2 x 60MVA, 132/34.5kV Transformers
  • COMPLETED