Engineering, Procurement and Construction of 2 x 15MVA, 33/11kV Substation at Festac

Scope of Work:

  • Construction of 33kV Busbars for 15MVA Power Transformer
  • Complete erection of 2x15MVA, 33/11kV Power Transformers with Outdoor & Indoor Control Relay Panel
  • 33kV and 11kV Instrument Transformers for metering and protection of Installation with associated switchgears
  • Installation of 110Vdc Battery and 110Vdc Battery Charger Systems & Provision of effective Earthing Systems
  • Construction of Perimeter Fencing, Switchyard gravelling, Lighting and related works
  • Construction of Cable Trench, laying and termination of all Power and Control Cables
  • Testing, Commissioning and maintaining within defect liability period
  • COMPLETED