Design, Manufacture & Supply of 132/33KV Switchgears, Terminal Equipment & Materials, Civil Works, Installation and Commissioning of 1 x 100MVA, 132/33KV Power Transformer & Auxiliary Equipment and Devices at Ogba Transmission Station, Lagos State.
Scope of Work:
Extension of 132kV & 33kV Busbars for 1x100MVA Power Transformer
Complete erection of 1 x 100MVA, 132/33kV Power Transformer Bay; 1 no. 500kVA, 33/0.415kV Earthing Transformer, Outdoor & Indoor Equipment necessary for MV and LV Bays for 100MVA Transformer
132kV and 33kV Instrument Transformers for metering and protection of Installation
Installation of 2 x 110Vdc Battery and 2 Nos. 110Vdc Battery Charger Systems
Construction of Perimeter Fencing, Switchyard gravelling, Lighting and related works
Provision of effective Earthing Systems for Ogba Substation
Construction of Cable Trench, laying and termination of all Power and Control Cables
Testing, Commissioning and maintaining within defect liability period