Design, Manufacture & Supply of 132/33KV Switchgears, Terminal Equipment & Materials, Civil Works, Installation and Commissioning of 1 x 100MVA, 132/33KV Power Transformer & Auxiliary Equipment and Devices at Ogba Transmission Station, Lagos State.

Scope of Work:

  • Extension of 132kV & 33kV Busbars for 1x100MVA Power Transformer
  • Complete erection of 1 x 100MVA, 132/33kV Power Transformer Bay; 1 no. 500kVA, 33/0.415kV Earthing Transformer, Outdoor & Indoor Equipment necessary for MV and LV Bays for 100MVA Transformer
  • 132kV and 33kV Instrument Transformers for metering and protection of Installation
  • Installation of 2 x 110Vdc Battery and 2 Nos. 110Vdc Battery Charger Systems
  • Construction of Perimeter Fencing, Switchyard gravelling, Lighting and related works
  • Provision of effective Earthing Systems for Ogba Substation
  • Construction of Cable Trench, laying and termination of all Power and Control Cables
  • Testing, Commissioning and maintaining within defect liability period
  • ONGOING